K11 universal waterproof coating

K11 universal type is an organic liquid material composed of polymer emulsions such as polyacrylate emulsion, vinyl acetate-vinyl copolymer emulsion and various high-quality additives, which can be selected according to the construction needs of cement, quartz sand, light and heavy calcium carbonate, etc. according to the ratio of slurry and powder according to 1:1 (if quartz sand is selected, the powder ratio is increased, and the waterproof film flexibility type will be correspondingly reduced). The total content of quartz sand in the powder should not exceed 40%) is a two-component water-based building waterproof coating.
Product overview
K11 universal type is an organic liquid material composed of polymer emulsions such as polyacrylate emulsion, vinyl acetate-vinyl copolymer emulsion and various high-quality additives, which can be selected according to the construction needs of cement, quartz sand, light and heavy calcium carbonate, etc. according to the ratio of slurry and powder according to 1:1 (if quartz sand is selected, the powder ratio is increased, and the waterproof film flexibility type will be correspondingly reduced). The total content of quartz sand in the powder should not exceed 40%) is a two-component water-based building waterproof coating.


Product characteristics
Powder can be prepared according to the construction needs, and color pigments can also be added to make color coating
Good film forming effect, fast curing, stable performance, excellent aging resistance, long waterproof life
Strong bonding force, good bonding properties for most materials
Good constructability, safe use, simple and convenient construction


Scope of application
Suitable for industrial and civil roofing and toilet bath, basement, reservoir or other places moisture treatment


Base surface treatment
The base surface must be smooth, solid, clean, free of oil, release agent, floating dust and other pine animals
Before coating the waterproof paste, it must be fully wet with clean water, and then construction will be carried out after there is no open water or stagnant water
For large holes and cracks should be repaired with plugging king or repair mortar


Reference dosage
The dosage is about 2.0kg/m²(the actual dosage depends on the actual situation of the base and the required waterproof layer thickness)




Matters needing attention
Please in the temperature of 8 to 35 ℃, the relative humidity is not greater than 85% of the conditions of construction, otherwise can not achieve the ideal penetration film effect


Construction technology
1. Base surface treatment (must be smooth, solid, clean, no oil, no empty drum)
2. Wet the base surface (the base surface must be fully wet, but there can be no open water and water)
3. Stir (pulp and powder mix and stir until no powder is left for a few minutes and then stir again)
4. Paint the first waterproof layer (brushing force should be uniform, thickness is the same, remember to evenly not miss the coating)
5. Paint the second waterproof layer (after the first layer of surface dry into a cross coating, must be uniform without leakage)
6. Strengthen the corner and the pipeline periphery (the construction of the corner and the pipeline periphery should be careful and strengthened)
7. Sprinkler maintenance (3 days wetting maintenance, no water)
8. Closed water test (24-48 hours closed water test for concave surfaces and pools)
9. Drainage protection (the next process will be carried out 8 hours after the drainage and maintenance of the concave water)


Storage method
This product should be stored in a cool ventilated dry place, suitable storage temperature 5-35 ℃


Shelf life
Original sealed products in a dry and cool environment (temperature 5 ℃ to 35 ℃, relative humidity is not more than 85%), shelf life of one year


Warm reminder
This product contains cement, may cause skin allergy, please take protective measures during operation, if accidentally splashed into the eyes, please rinse with water, if necessary, seek medical assistance in time
Before use, be sure to read the relevant information and construction instructions of the product in detail, please strictly follow the construction process, otherwise the construction accident will be borne by the construction party

contact US

  • Foshan Shunde Jingjian building Materials Co., LTD
  • ADD:204, Building 10, Kangbao Huateng Kitchen Electric City, Xingtan Town, Shunde District, Foshan City
  • website:www.tubluce.com
  • Copyright© tubluce All rights reserved

Service telephone

400-088-8576

Be concerned with tubluce

to get updatedinformationa

tubluce | One-stop wall-painting solution supplier

Foshan Shunde Jingjian building Materials Co., LTD Professional architectural coating manufacturers, to meet the diversified needs of the market